CesiumAstro: Skylark Validation Test

CesiumAstro's Skylark team gathered in Colorado for a milestone validation test. Watch as their Skylark SATCOM terminal tracks a drone simulating a LEO satellite, maintaining a live Ka-band link while on the move. Beam steering, modulation, IMU/GPS tracking, and more—all functional, all under pressure, all in the elements. It’s what Skylark is built for—operational performance, reliability in challenging conditions, and mission flexibility—delivered by a team engineering at the edge of performance, advancing a proven system to exceed the possible.

Client

CesiumAstro

Date

April 4, 2025

Role

Full Service Production

Stay in Orbit

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.